References

W&P, Wietersdorf (AT)

In 2004 A TEC installed a 5 stage preheater with combustion chamber in Wietersdorf. The main features of the W&P project were: a low heat consumption, a long calciner retention time, the usage of low grade fuel and low emissions.

Read more