References

Lafarge Holcim, Kujawy (PL)

A TEC provided LafargeHolcim’s plant with an alternative fuel chlorine by-pass increased system for the clinker line in 2016. The existing bypass system (designed by A TEC) has a design bypass rate of 5 % (5.000 Nm³/h kiln gas removed) using a two stage air queching step. After realising the project the bypass rate will be increased up to 10 %.