News
Two new A TEC calciners for Aalborg Portland Cement
07.03.2017 - Two new calciners are designed and delivered by A TEC during the annual kiln stop in February/March 2017. The project aims to increase the production of grey clinker. A TEC is going to adapt the flow pattern of the calciner system in a way to improve the operation behavior of the system significantly. The design will be configured for the usage of 100% SAF with the lowest possible emissions.